Submenu: |
Visit to the Kyzyl-Tashtyg DepositOn June, 28-30 2010 Director General of JSC "Sibtsvetmetniiproekt" Sergey V. Ivanov, Chief Engineer Vladimir G. Kozlov and Deputy Project Engineer Gennadiy I. Grelovsky held several meetings with the Chairman of Longsing, Ltd. Board of Directors Lin Zhuyten and CEO Zhao Syaosun on the design and construction of the Kyzyl-Tashtyg Mining and Processing Plant. A trip to the Kyzyl-Tashtyg deposit of polymetallic ores was organized in order to inspect the facilities under construction designed by JSC “Sibtsvetmetniiproekt”.
|
|
JSC «Sibtsvetmetniiproekt»
Russia, 660075, Krasnoyarsk, Mayerchaka st., 8 Tel: (391) 221-30-63 Fax: (391) 221-87-05 send mail |
|
|
| |